Change Order of Session Roles

animation

Click on the session title. Scroll down to “Session Roles” section. To change the order, click on the 3 dots (to the left of the title associated with the role to be moved) and drag and drop role into new slot. The new order is automatically saved after the role is dropped in new slot.

Click to access the login or register cheese